Highway and Transit Projects
Highway
29. US 1 Bypass – Hickory to MD 147/Business US 1: Widen to 4 lanes with interchange improvement (2020)
30. MD 24 – Singer Rd to Business US 1: Widen to 6 lanes (2015)
31. MD 22 – MD 543 to I-95: Widen to 4 lanes (2020)
32. MD 715 – US 40 to MD 22: New 4 lane road (2020)
33. US 1 – MD 147/Business US 1 to MD 152: Widen to 6 lanes (2020)
34. MD 22 – I-95 to APG Gate: Widen to 6 lanes (2030)
Transit
50. MARC Aberdeen Station – Relocate
with station improvements (2015)
Bicycle and Pedestrian Projects
16. Lower Susquehanna Heritage Greenway Trail: Construct bike/ped
trail from Conowingo Dam along
the Susquehanna River to Havre
de Grace (2013)
17. Aberdeen Area Bikeway (MD
132): Construct bike/ped trail from
Ripken Stadium to Aberdeen
MARC Station (2015)
18. Havre de Grace Bikeway: Construct
bike/ped trail from Juanita Street to
Tydings Park (2015)
19. MD 152 Corridor Bikeway:
Construct bike/ped trail from Hess
Rd to Trimble Rd (2015)
20. MD 24 Bikeway: Construct bike/ped
trail from US 1 to Bel Air South
Parkway (2015)
21. Trimble Road Bikeway: Construct
bike/ped trail from Edgewood
Recreational Park to Flying Point
Park (2015)
22. Winters Run Greenway: Construct
bike/ped trail from Tollgate Rd to
Winters Run (2015)
23. Woodsdale Rd/Waldon Rd
Bikeway: Construct a bike/ped trail,
along Woodsdale Rd and Walden
Rd, from MD 924 to Edgewood Rd
(2016)
24. Colonial Joppa Greenway Trail:
Construct bike/ped trail in the
Foster Run Stream Valley Corridor
from MD 40 to Mariner Point Park
(2020)
Published Plans, Reports and Links
Transportation Outlook 2035. The process is underway for this plan to replace Transportation 2030. Time to get involved. The revised draft plan is available resulting from public comments in August. Little change from the prior draft is noticeable for Harford County projects.