Transportation Outlook 2035

Harford County Projects

Highway and Transit Projects

Highway
29. US 1 Bypass – Hickory to MD 147/Business US 1: Widen to 4 lanes with interchange improvement (2020)
30. MD 24 – Singer Rd to Business US 1: Widen to 6 lanes (2015)
31. MD 22 – MD 543 to I-95: Widen to 4 lanes (2020)
32. MD 715 – US 40 to MD 22: New 4 lane road (2020)
33. US 1 – MD 147/Business US 1 to MD 152: Widen to 6 lanes (2020)
34. MD 22 – I-95 to APG Gate: Widen to 6 lanes (2030)

Transit
50. MARC Aberdeen Station – Relocate with station improvements (2015)

Bicycle and Pedestrian Projects

16. Lower Susquehanna Heritage Greenway Trail: Construct bike/ped trail from Conowingo Dam along the Susquehanna River to Havre de Grace (2013)
17. Aberdeen Area Bikeway (MD 132): Construct bike/ped trail from Ripken Stadium to Aberdeen MARC Station (2015)
18. Havre de Grace Bikeway: Construct bike/ped trail from Juanita Street to Tydings Park (2015)
19. MD 152 Corridor Bikeway: Construct bike/ped trail from Hess Rd to Trimble Rd (2015)
20. MD 24 Bikeway: Construct bike/ped trail from US 1 to Bel Air South Parkway (2015)
21. Trimble Road Bikeway: Construct bike/ped trail from Edgewood Recreational Park to Flying Point Park (2015)
22. Winters Run Greenway: Construct bike/ped trail from Tollgate Rd to Winters Run (2015)
23. Woodsdale Rd/Waldon Rd Bikeway: Construct a bike/ped trail, along Woodsdale Rd and Walden Rd, from MD 924 to Edgewood Rd (2016)
24. Colonial Joppa Greenway Trail: Construct bike/ped trail in the Foster Run Stream Valley Corridor from MD 40 to Mariner Point Park (2020)

Published Plans, Reports and Links

Transportation Outlook 2035. The process is underway for this plan to replace Transportation 2030. Time to get involved. The revised draft plan is available resulting from public comments in August. Little change from the prior draft is noticeable for Harford County projects.